Loading Events

« All Events

ASCE: Joint ASCE Section Meeting with SAME-MSP

March 27 @ 11:30 am - 1:30 pm

Smith Avenue High Bridge Project
1-PDH
Presentation Synopsis:

The Smith Avenue High Bridge is a major entry-way into downtown St. Paul that crosses over the Mississippi River.  The original bridge at this location was opened in 1889.  The bridge that is standing at this location today was constructed in 1987.  In need of a new deck, the bridge was closed in 2017 for a period of 15 months.  Bridge repairs were completed and the bridge was reopened this past December.  Dale Gade will discuss the High Bridge project in St. Paul including the contracting methods, public engagement, and environmental concerns.

Presenter:

Dale Gade, Area Engineer, Metro Division of MnDOT

Meeting Location:

Grumpy’s Bar & Grill
2801 Snelling Ave.
Roseville, MN

Luncheon Menu:

A buffet lunch will be available for purchase for $23 with your reservation.

Agenda:

Social time and lunch (if you so desire) will be from 11:30 AM to 12:30 PM.
Post Meeting and Presentation will be from 12:30 PM to 1:30 PM.

RSVP:

RSVPs (with or without lunch) are Required.   Deadline not later than February 20th with your lunch choice or presentation only. We are using Eventbrite for RSVPs.   Please follow the link to RSVP: https://www.eventbrite.com/e/march-2019-professional-development-meeting-joint-meeting-with-asce-mn-tickets-58400286830

Details

Date:
March 27
Time:
11:30 am - 1:30 pm
Event Categories:
,

Venue

Grumpy’s in Roseville
2801 Snelling Ave
Roseville, MN 55113 United States